Completed Projects

Bulkhead inserts in longitudinal holds. Repairs following impact by a port crane grab during ship loading

PORT SERVICES

Self-unloading hopper for the transport of grain and bulk materials. DOR 30 tonnes
Stationary hopper for loading bulk materials from the quay onto the vessel
High-pressure washing of the vessel’s holds. Preparation of the holds for grain loading following the unloading of coal. Use of acidic and alkaline chemicals.
Construction of a vertical and horizontal conveyor, including a canopy, for loading grain into a silo.
Construction of a silo for conveying bulk materials to a belt conveyor.
Widening of the hopper for loading lorries with bulk material.
Repair of a damaged ship crane boom.
Repair of a terminal tractor hitch, fabrication of locking pins.
Transport and stowage of oversized cargo on board a ship.
Repair of a ship’s crane grab, replacement of cutting blades.
Access ramp for washing vehicles up to 60 tonnes.
Recovery of an anchor lost by a ship in Gdańsk Bay.
Removal of ice from a ship.
Repair a chain grab of an anchor windlass by build up welding.
Repair of ship’s cranes.
Reconditioning of hydraulic cylinders.
Repair of a ship-mounted excavator’s travel mechanism.
Replacement of hydraulic hoses on a ship-mounted excavator.
Replacement of the main engine injector.
Mooring of vessels.
Repair of the excavator grab rotator.
Repair of an aluminium gangway.
Repair by build-up welding of a dent in a hatch cover.
Prefabrication and replacement of the antenna mast.
Section construction.

SHIPYARD SERVICES

Construction of steel bridge sections.

CONSTRUCTION SERVICES

Welding of C9-type steel locks to a 508x12.5 steel pipe.
Demolition work. Removal of a concrete base (concrete + steel reinforcement). The concrete base formed the foundation for a container crane.